What you need before you start
- Your subcontract: the original contract sum, the retainage rate and the contract date.
- Your schedule of values, exactly as the general contractor approved it.
- Every change order the GC has executed, with its amount.
- Last month's pay application, for the work billed to date and the amount you applied for.
How the pay application math works
A pay application has two parts. The continuation sheet lists each line of your schedule of values and how much of it is complete. The application summary rolls those lines up into nine numbers:
| Line | What it is | How it's worked out |
|---|---|---|
| 1 | Original contract sum | The amount of your subcontract before any change orders. |
| 2 | Net change by change orders | Approved additions minus approved deductions. Pending requests do not count. |
| 3 | Contract sum to date | Line 1 plus line 2. Your schedule of values must add up to this number. |
| 4 | Total completed and stored to date | Column G of the continuation sheet: previous work, this period's work and stored materials. |
| 5 | Retainage | Your contract's retainage rate applied to completed work and to stored materials. |
| 6 | Total earned less retainage | Line 4 minus line 5. |
| 7 | Less previous certificates for payment | Line 6 from your last application: what you have already applied for. |
| 8 | Current payment due | Line 6 minus line 7. This is the amount you are asking for this month. |
| 9 | Balance to finish, including retainage | Line 3 minus line 6: what is left on the contract, with retainage still held. |
On the continuation sheet, each line's total to date is its previous applications plus this period plus stored materials. Percent complete is that total divided by the scheduled value, and balance to finish is the scheduled value minus the total.
Why pay applications get sent back
- The schedule of values does not add up to the contract sum to date.
- A change order is billed before the general contractor has approved it.
- The retainage rate does not match the subcontract.
- A line is billed past 100% of its scheduled value.
- Previous payments (line 7) do not match last month's application.
- It arrives after the GC's monthly cutoff, so it waits for the next draw.
This generator checks the first five as you type. The sixth is the one that costs a month of cash flow, and it is why subPAY.ai exists: every general contractor's pay app deadline on one calendar, with reminders before each one. Here is the story behind it.
Use an AI assistant? The same math is available to Claude and ChatGPT through the free construction billing toolkit.
Frequently asked questions
Is the pay application generator really free?
Yes. There is no account, no email address and no watermark across the page. Fill in the form and download the PDF as many times as you like.
Is this an official AIA G702 or G703 form?
No. It produces a pay application in the same widely used structure (an application summary with lines 1 through 9 and a continuation sheet with columns A through I), but it is not an AIA Contract Document. Most general contractors accept this format from subcontractors. If your subcontract specifically requires the licensed AIA document, you need to buy that from the AIA.
Where are my numbers stored?
In your own browser only. The draft is saved on your device so it is still there when you come back, and the PDF is built on your device. Nothing you type is sent to subPAY.ai.
How is retainage calculated?
Retainage is your contract's rate applied to the work completed to date (previous applications plus this period) and to stored materials. You can set a different rate for stored materials. The total is line 5 and is subtracted from line 4 to give total earned less retainage.
How do I do next month's pay application?
Use "Start next month's application". This period's work moves into previous applications, this month's change orders move into previous months, line 7 picks up the amount you just applied for, and the application number goes up by one.
Can I use this for Textura, Procore or GCPay?
Those portals build the pay application for you, so you enter your numbers there. This generator is for general contractors you bill directly by email or on paper. It is also a quick way to check a portal's math before you sign.
Should I bill a change order that the GC has not approved yet?
No. Only change orders the general contractor has executed belong on a pay application. Billing a pending request is one of the most common reasons a pay app gets sent back.
Billing more than a few jobs a month?
subPAY.ai tracks every pay app from submitted to paid, across Textura, Procore, GCPay and the GCs you bill directly, along with retainage and change orders.
Start a 30-day free trialNo credit card needed.AIA, G702 and G703 are registered trademarks of The American Institute of Architects. subPAY.ai is not affiliated with or endorsed by the AIA, and this tool does not produce an AIA Contract Document. It is a calculation aid, not legal or accounting advice: check the result against your subcontract before you sign it.